Frequently Asked Questions

  • Q1.Here are the general steps to mount solar panels on a flat roof:

    Conduct a Roof Assessment:

    Check Structural Integrity: Ensure that the flat roof can bear the extra weight of the solar panel system, which usually weighs 2 - 4 pounds per square foot. Professional installers are recommended to evaluate the load - bearing capacity.

    Examine Roof Membrane: The roof membrane should be in good condition with at least 10 years of service life remaining to avoid potential leakage problems.

    Measure Unobstructed Space: Make sure there is enough unshaded space to install solar panels according to the planned system size.

    Choose a Mounting System:

    Ballasted System: This is a popular option as it doesn't require penetrating the roof. It uses weight blocks, such as concrete blocks, to secure the solar panels and prevent wind uplift. The installer will calculate the appropriate ballast weight based on factors like building height, roof edge distance, and panel dimensions.

    Mechanically Attached System: This system offers maximum stability but requires roof penetrations. It is usually more suitable for roofs with a strong structure that can handle the penetrations.

    Hybrid System: As the name suggests, it combines the features of both ballasted and mechanically attached systems to achieve optimal stability.

    Prepare the Roof Surface: Clean the roof surface to remove any debris, dirt, or loose materials that could affect the installation or cause damage to the panels. If there are any existing protrusions or obstacles on the roof, such as HVAC units or vents, plan the panel layout to avoid them and ensure easy access for maintenance3.

    Install the Mounting System:

    For Ballasted System: First, lay out the metal racking system on the flat roof. Then, place the solar panels on the rack and secure them with screws. Finally, put the heavy concrete blocks on the racking system as ballast to keep the entire system in place.

    For Mechanically Attached System: Drill holes in the roof at the predetermined locations and attach the mounting brackets or rails using bolts or screws. Seal the penetration points properly to prevent water leakage.

    For Hybrid System: Follow a combination of the above two methods according to the specific design requirements.

    Install the Solar Panels: Place the solar panels on the installed racking or mounting system and secure them firmly using clamps or other fixing devices. Make sure the panels are properly aligned and spaced evenly for optimal sunlight exposure and airflow.

    Connect the Electrical Wiring: Run the electrical wiring from the solar panels to the inverter and then to the electrical panel of the building. The wiring should be installed in accordance with local electrical codes and safety standards to ensure safe and efficient power transmission.

    Perform Final Testing and Inspection: After the installation is complete, conduct a comprehensive test to check the performance of the solar panel system, including measuring the voltage, current, and power output of the panels. Also, inspect the entire installation to ensure that all components are properly installed, the wiring is secure, and there are no potential safety hazards.

  • Q2.What types of solar mounting systems does Yijia Solar specialize in?

    Yijia Solar specializes in ground mount solar systems, solar farm mounting systems (including agrovoltaic and desert variants), roof mount systems, and floating PV mounting systems, along with related energy storage solutions.  

  • Q3.What is the wind resistance capability of Yijia's ground mount solar systems?

    Our ground mount solar systems are engineered to withstand winds of 140+ km/h, ensuring high stability in diverse weather conditions.  

  • Q4.How does the cost of Yijia's ground mount systems compare to roof mount systems?

    Ground mount systems typically cost $0.15–$0.25/W, while roof mount systems range from $0.20–$0.35/W, making ground mount options more cost-efficient for large-scale projects.

  • Q5.Can Yijia's solar farm mounting systems be integrated with agricultural activities?

    Yes, our agricultural farmland mounting systems feature elevated designs (2.5m+ clearance) for farm equipment, adjustable light transmission, and corrosion-resistant materials, enabling dual land-use for energy production and farming.  

  • Q6.What materials are used in Yijia's solar mounting systems?

    Our systems primarily use hot-dip galvanized steel (e.g., 80μm coating for ground mounts, 86μm for solar farms) with aluminum alloy components, ensuring strong corrosion protection.  

  • Q7.How long does installation take for Yijia's ground mount systems?

    With pre-assembled components, installation time is reduced by 30% compared to traditional systems, allowing for efficient deployment even for large-scale projects. 

  • Q8.What certifications do Yijia's solar products hold?

    Our products have passed international certifications including ISO 9001, TUV, UL 2703, SGS, and CE, ensuring compliance with global quality and safety standards.  

All-in-One Energy Storage System
Solar Inverter
Solar Battery
Solar Panel
Solar Water Pump

Product Display

YiJia Solar focuses on the production of solar photovoltaic support systems, providing one-stop smart energy solutions and a full range of home energy storage configurations.

+86-153-6907-3025

Manage Your Privacy: Cookie Policy for Solar Mounting System Solutions

At Yijia Solar, we use cookies to enhance your experience on our solar mounting system platform. Cookies help us analyze site traffic, personalize content, and optimize load calculation tools for rooftop, ground-mounted, and hybrid solar installations. Control Your Preferences: Adjust cookie settings via your browser or decline non-essential cookies below. For details, review our full Privacy Policy.